GALLERY

COVERED SHED (12 M X 20 M) IN WORKS

FABRICATION & MACHINING FACILITIES

FABRICATION & ASSEMBLY OF PA FAN CASING FOR 110 MW UNIT AT ETPS

FABRICATION & ASSEMBLY OF PA FAN CASING FOR 110 MW UNIT AT ETPS

FABRICATION & ASSEMBLY OF FUEL GAS DAMPERS

FABRICATION OF HOT COMBUSTION GAS FAN

FABRICATION OF HOT COMBUSTION GAS FAN

FABRICATION & ASSEMBLY OF FLUE GAS DAMPER

FABRICATION OF STRUCTURES

FABRICATION OF WATERBOX FOR 110 MW UNIT

CUTTING PLAN MAKING AS PER DRAWING

PLATE CUTTING

PLATE ROLLING

FABRICATION OF METALLIC BELLOWS FOR 210 MW UNIT

FABRICATION OF MITRE BEND

DISHED END PREPARATION

FABRICATION & ASSEMBLY OF DEAERATOR WITH STORAGE TANK

FABRICATION & ASSEMBLY OF DEAERATOR WITH STORAGE TANK

LIFTING & TRANSPORTATION OF DEAERATOR WITH STORAGE TANK

FLASH TANK FABRICATION, SUPPLY & ERECTION FOR 210 MW UNIT-1 AT TTPS

FLASH TANK FABRICATION, SUPPLY & ERECTION FOR 210 MW UNIT-1 AT TTPS

FABRICATION & INSPECTION OF HEAT EXCHANGERS

FABRICATION & INSPECTION OF HEAT EXCHANGERS

MANUFACTURING OF OIL GUN ASSEMBLIES

MANUFACTURING OF IGNITOR GUIDE PIPES ASSEMBLIES

MANUFACTURING OF SCANNER GUIDE PIPE ASSEMBLIES

LLOYDS INSPECTION OF OIL GUN ASSEMBLIES

THIRD PARTY INSPECTION BY LLOYDS REGISTER, ASIA

SHOP INSPECTION BY SENIOR TNEB OFFICILAS

OIL SYSTEM SKID ASSEMBLY FABRICATED & ERECTED AT 60 MW UNIT IN ETPS

MULTIPLANE COAL PIPING FABRICATION & ERECTION AT 60 MW UNIT-I AT ETPS

FABRICATION & ERECTION OF BURNER ASSEMBLY IN UNIT-I, 60 MW AT ETPS

FABRICATION & ERECTION OF BURNER ASSEMBLY IN UNIT-I, 60 MW AT ETPS

ERECTION OF HP HEATER ASSEMBLY WITH NEW SEALING STRIP AT UNIT-I, 210 MW AT TTPS

ERECTION OF HP HEATER ASSEMBLY WITH NEW SEALING STRIP AT UNIT-I, 210 MW AT TTPS

TOSHIBA - OUR FACTORY INSPECTION FOLLOWED BY TECHNICAL DISCUSSIONS AT OUR WORKS

TOSHIBA - OUR FACTORY INSPECTION FOLLOWED BY TECHNICAL DISCUSSIONS AT OUR WORKS

AFTER SUCCESSFUL VENDOR APPROVAL BY TOSHIBA FINISHED PRODUCT INSPECTION AT OUR WORKS BY TOSHIBA EXPERTS

AFTER SUCCESSFUL VENDOR APPROVAL BY TOSHIBA FINISHED PRODUCT INSPECTION AT OUR WORKS BY TOSHIBA EXPERTS

210 MW SEA WATER COOLED LMW DESIGN CONDENSER REPAIR WORK
BEFORE
BEFORE

210 MW SEA WATER COOLED LMW DESIGN CONDENSER REPAIR WORK
AFTER
AFTER

210 MW SEA WATER COOLED KWU DESIGN CONDENSER REPAIR WORK
BEFORE
BEFORE

210 MW SEA WATER COOLED KWU DESIGN CONDENSER REPAIR WORK
AFTER
AFTER

110 MW SEA WATER COOLED CONDENSER REPAIR WORK
BEFORE
BEFORE

110 MW SEA WATER COOLED CONDENSER REPAIR WORK
AFTER
AFTER

GLAND STEAM COOLER FOR 210 MW TUBE ASSEMBLY

GLAND STEAM COOLER FOR 210 MW TUBE EXPANSION

GLAND STEAM COOLER FOR 210 MW FINAL ASSEMBLY AFTER HYDRO TEST

GLAND STEAM COOLER FOR 210 MW BEING TRANSPORTED TO SITE

LUB OIL COOLER TUBE RENEWAL WORK OF MTPS – 210 MW

MANUFACTURING OF VENT CONDENSER JOB OF MTPS - 210 MW

RENEWAL OF AUXILIARY COOLING WATER (ACW) 600 & 800 MM PIPIELINES & BENDS IN 600 MW UNIT AT NCTPS - II

FABRICATION OF MITRE BENDS AND WELDING OF ACW PIPE LINE AT 600 MW NCTPS - II

FABRICATION AND WELDING OF ACW PIPE LINE AT 600 MW NCTPS - II

FABRICATION AND EPOXY CERAMIC CLADDING OF 800 MM DIA MITRE BEND FOR 600 MW UNIT AT NCTPS - II

EPOXY CERAMIC CLADDING OF ACW STRAINER DISH END IN 600 MW UNIT AT NCTPS - II

AUXILIARY COOLING WATER PIPE LINE – AFTER COMMISSIONING IN 600 MW UNIT AT NCTPS - II

SUPPLY OF MACHINED IBR COMPONENTS – FOR BHEL -TRICHY

SUPPLY OF INTRICATELY MACHINED TRUNNIONS TO BHEL - TRICHY

QUALITY INSPECTION BY BHEL FOR TRUNNIONS

SUPPLY OF I - BEAMS AFTER BLASTING & PAINTING OF I - BEAMS TO BHEL

MANUFACTURING OF PLATE FORMED PIPES FOR BHEL -TRICHY

FABRICATION AND SUPPLY OF OIL SIGHT ASSEMBLIES TO TOSHIBA FOR 800 MW TG SETS

LOADING OF LONG PIPE

DISPATCH OF DEAERATOR STORAGE TANK ASSEMBLY

LIFTING & TRANSPORTATION OF DEAERATOR WITH STORAGE TANK